Re: 0PP_C01 Infocube confusation..

$
0
0

Hi ,

 

) Do I have to Delete its (LIS_04_P_MATNR) Setup Tables and then Re-install it?

 

Don't disturb ecc part. if your in bw 7.x, once info cube moved prod, first time load full DTP and later convert the same dtp to delta(0PP_C01).

 

2) Would its UPDATE MODE would the same like OPP_C02 cube OR  would be different for 0PP_C01?

 

don't touch anything ragarding data source part. just go with as said at 1 step.

 

 

3) Is there any special method to populate its data and managing its delta?

if your 3.x follow above suggestion , if 7.x follow on 1 step.

 

4) Or, I treat this data-source like as I did 0PP_C02 cube?

not clear what your saying

 

5) I need to install and populate data for infocube 0PP_C03, could you please specify any precautions, i need to consider while loading data.

 

i think you may test dev system once you designed. go with asusual steps.

 

About 0PUR_C01, check data how look like at RSA3 and PSA. if not matching, then check  ECC base tables and rsa3. you may find where probles was.

 

Thanks